Diaphragm wall construction method Product List and Ranking from 6 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

Diaphragm wall construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. 太洋基礎工業 Aichi//General contractors and subcontractors
  2. ミニウォール工法協会 Tokyo//others
  3. 九洲日東 Fukuoka//Architectural design office
  4. null/null
  5. 5 東亜建設工業 技術研究開発センター Tokyo//others

Diaphragm wall construction method Product ranking

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. Construction Case Study "TRD Method" 太洋基礎工業
  2. Expansion of the application range of TRD method "TRD-wide method" 太洋基礎工業
  3. Catalog & Case Studies / Construction of Small-Scale Thick-Walled Continuous Walls "Mini-Wall Method" 太洋基礎工業
  4. 4 Construction Case Study: "Mini Wall Method" 太洋基礎工業
  5. 5 Small-scale uniform thickness underground continuous wall method "Mini Wall Method" ミニウォール工法協会

Diaphragm wall construction method Product List

1~11 item / All 11 items

Displayed results

Small-scale uniform thickness underground continuous wall method "Mini Wall Method"

[NETIS Registration] Compatible with narrow sites! A construction method that allows for a maximum depth of 20m using compact machinery!

This construction method involves mixing and agitating cement slurry discharged from the bottom of the post and the ground using a chainsaw-type cutter mounted on a cutter post, creating a soil-cement underground continuous wall with high water-stopping properties and uniform strength in the vertical direction. Since a wall of uniform thickness can be created, it is possible to install core materials at arbitrary intervals, allowing for greater flexibility in soil retention design and the construction of economical soil-retaining water-stopping continuous walls. Additionally, this method can also be applied as a permanent soil retaining wall construction method using concrete sheet piles, and the number of construction achievements is increasing nationwide. 【Features】 ■ Capable of creating a homogeneous wall with minimal strength variation in the depth direction ■ Capable of creating a highly water-stopping wall with no discrepancies throughout ■ Excellent cutting ability, adaptable to a wide range of ground conditions ■ Excavation thickness can be adjusted by changing the cutter bits (250–800mm at 50mm intervals) ■ Construction possible in narrow spaces ■ Construction possible close to structures and at property boundaries ■ The use of a suspended leader allows for step construction (5–6m) For more details, please feel free to contact us.

  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Construction Results of Mini Wall Method

[NETIS Registration] Introducing the main construction achievements of the mini-wall method!

This construction method involves mixing and stirring cement slurry discharged from the base ground and the bottom end of the post in a vertical direction using a chainsaw-type cutter mounted on a cutter post, creating a soil-cement underground continuous wall with high water-stopping ability and uniform strength in the vertical direction. Since a wall of uniform thickness can be created, it is possible to install core materials at arbitrary intervals, allowing for greater flexibility in soil retention design and the creation of economical soil-retaining water-stopping continuous walls. Additionally, this method can also be applied as a permanent soil retaining wall construction method using concrete sheet piles, and the number of construction achievements is increasing nationwide. 【Features】 ■ Capable of creating a homogeneous wall with minimal strength variation in the depth direction ■ Capable of creating a highly water-stopping wall with no discrepancies throughout ■ Excellent cutting ability, adaptable to a wide range of ground conditions ■ Excavation thickness can be adjusted by changing the cutter bits (250–800mm) ■ Construction possible in narrow spaces ■ Construction possible close to structures and at property boundaries For more details, please feel free to contact us.

  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

DIA-WIN Method for Diaphragm Wall Construction

Nishimatsu's underground continuous wall method that functions for buildings on weak ground.

The "DIA-WIN Method" is a total system from design to construction, incorporating functions such as seismic walls, composite walls (continuous walls + post-installed walls), two-way slab lateral pressure walls, and wall piles, applicable to a wide range of uses from temporary to permanent structures, including deep and thick walls of up to 150 meters. It is a Nishimatsu-style continuous wall method. The joints between the walls have a simple shape, making them easy to clean and providing excellent concrete fillability. Additionally, the use of H-shaped steel materials enhances water-tightness. 【Features】 ■ Excellent cost-effectiveness ■ Applicable to any type of ground ■ Constructs high-quality wall bodies ■ Simple and water-tight joint shape *For more details, please download the PDF or contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SMW Soil Continuous Wall Method

By using different mixing devices that match the soil conditions, a uniform and high-quality continuous wall can be constructed.

This technology involves using a multi-axis earth auger equipped on a three-point pile driver to drill into the original ground while mixing and stirring with a cement-based slurry to create a continuous wall and insert stress materials with appropriate strength. By utilizing mixing devices that are suitable for the soil conditions, it is possible to create a uniform and high-quality continuous wall. Additionally, it can be used for various applications such as retaining walls, water-stopping walls, underground collapse prevention walls, various ground improvements, and pre-drilling for sheet pile driving in hard ground, making it versatile across a wide range of uses. 【Features】 ■ Can be constructed if there is more than 400mm between adjacent structures and the soil core ■ By changing the drilling and mixing device, it is possible to increase the pile diameter ■ Usable across a wide range of applications *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RDS underground continuous wall method

RDS underground continuous wall method

Foundation construction methods with functions as permanent structures for underground facilities, including temporary retaining walls, underground outer walls, two-way slab lateral pressure walls, composite walls, seismic walls, and support piles. 【Features】 - Expansion of underground space through composite walls and two-way slab lateral pressure walls. - Simple joint structure providing excellent workability and water-tightness. - High-precision construction management through a unique system, including excavation machine management, excavation accuracy management, concrete placement management, and stabilizing fluid management. For other functions and details, please contact us.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TRD method: uniform thickness soil-mixed ground continuous wall method

TRD method

This construction method connects a chainsaw-type cutter inserted into the ground to a base machine, allowing it to move laterally to excavate a trench, inject a solidifying liquid, and mix and stir with the in-situ soil, thereby creating a continuous soil-cement wall underground.

  • Ground foundation construction method
  • Other civil engineering services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Catalog & Case Studies / Construction of Small-Scale Thick-Walled Continuous Walls "Mini-Wall Method"

Packed with fundamental knowledge and case studies! We are currently offering a free catalog and case study collection on the mini-wall construction method, which can accommodate narrow sites and is capable of construction at a maximum depth of 20 meters with small machinery!

The "Mini Wall Method" is a construction technique that creates a soil-cement underground continuous wall with high water-stopping properties and uniform strength in the vertical direction by mixing and agitating cement slurry discharged from the base ground and the bottom end of the post using a chainsaw-type cutter mounted on a cutter post. Since uniform thickness walls can be created, it is possible to install core materials at arbitrary intervals, allowing for greater flexibility in soil retention design and the construction of economical soil-retaining water-stopping continuous walls. ■ We are currently offering a catalog summarizing basic knowledge and a collection of construction examples as a gift! 【Features of the Mini Wall Method】 ■ Due to the uniform thickness of the wall, the installation interval of the stress core material can be set arbitrarily. ■ Wall thickness can be adjusted by changing the cutter bits. ■ Construction close to structures and at property boundaries is possible. ■ The use of a suspended leader allows for step construction (5-6 m). * Please refer to the PDF data of the catalog and construction examples of the "Mini Wall Method" available for download.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case Study "TRD Method"

Basic information about the TRD method and various construction examples are provided! Outstanding stability! Capable of constructing underground continuous walls at a maximum depth of 60 meters with a machine height of 10 meters!

The "TRD Method" is a construction technique that involves moving a cutter post installed underground laterally while excavating the ground with cutter bits attached to a cutter chain. During this process, a solidifying liquid is mixed and stirred with in-situ soil in a vertical direction to create a wall-like solidified body underground. 【Features】 1. Outstanding stability 2. High precision construction is possible 3. Cost savings achieved through excellent excavation capability 4. Homogeneous wall quality in the depth direction 5. Continuous structure without discrepancies 6. Arbitrary setting of core material spacing is possible *For more details, please feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case Study: "Mini Wall Method"

Basic information on the mini wall construction method and various case studies are included! It can accommodate narrow sites and can achieve a maximum depth of 20m with small machinery!

The "Mini Wall Method" is a construction technique that creates a soil-cement underground continuous wall with high water-stopping capability and uniform vertical strength by vertically mixing and agitating cement slurry discharged from the ground and the lower end of the posts using a chainsaw-type cutter mounted on a cutter post. Since it allows for the creation of walls of uniform thickness, it is possible to install core materials at arbitrary intervals, providing high flexibility in soil retention design and enabling the construction of economical soil-retaining water-stopping continuous walls. **Features of the Mini Wall Method** - Due to the uniform thickness of the wall, the installation interval of stress core materials can be set arbitrarily. - Wall thickness can be adjusted by rearranging the cutter bits. - Construction is possible in close proximity to structures and at property boundaries. - The use of a suspended leader allows for stepped construction (5-6 meters). *For the catalog and construction examples of the "Mini Wall Method," please refer to the PDF data available for download.*

  • Ground foundation construction method
  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Expansion of the application range of TRD method "TRD-wide method"

The "TRD-wide method" is a wide-type "TRD method." The use of large core materials allows for a reduction in support materials!

The "TRD Method" is a construction technique that involves moving a cutter post installed underground horizontally while excavating the ground with cutter bits attached to a cutter chain, mixing and stirring a solidifying liquid with in-situ soil in a vertical direction, and creating a solidified body in the ground. 【Features】 1. Outstanding stability 2. High-precision construction possible 3. Cost savings achieved through excellent excavation capability 4. Homogeneous wall quality in depth direction 5. Continuous without discrepancies 6. Arbitrary setting of core material spacing possible Outstanding stability, high-precision construction, and excavation capability! A ground continuous wall method adaptable to various applications! *For more details, please feel free to contact us.

  • TRD長野.png
  • 市川掘削.JPG
  • 札幌掘削.JPG
  • Foundation construction
  • Temporary Construction
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration